HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

HTRI calculation yields a warning for vertical thermosyphon heat exchangers

2015-08-17View Original

Thread Content

He specified that a vertical e*t height was used in the Dukler Flow Map calculations. For cases with multiple e*t nozzles, the minimum vertical distance of a pipe for which slug flow can occur is 105.355 inches; otherwise, churn flow takes place. Check your actual pipe dimensions. What does this warning mean? Where is the problem?
Reply #22015-08-17
The main issue is that not many people use the HTRI software; it’s entirely in English, and if errors occur, people may not understand them very well. It’s better to read his instructions carefully and try to enter all the parameters correctly.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.