Thread Content
Dear experts, the company has recently launched a new project, but the patent holder has not yet been identified. The company wants to conduct a design bidding process first to determine the design firm. I would like to ask everyone: how should such a design bidding process be carried out in this situation? How to quote for a design? Could you send me a similar tender document? Urgent! Urgent! Urgent! Waiting online, thank you! ! !
What chemical projects should be launched at this time?
What chemical projects should be launched at this time?
Hello, it’s a bit difficult to determine the design firm and the design cost without first reaching an agreement with the patent holder! Some issues need to be determined first: what level your boss or supervisor wants your project to be at. In other words, what type of design firm are you looking for? Do you want to work with a large, highly skilled firm, or with a firm whose technical capabilities are average? Or maybe you’re looking to save money by choosing a firm that isn’t actually a proper design firm – something like a shell company that relies on someone else’s qualifications. If you have substantial financial resources, it’s perfectly fine to choose a company with stronger capabilities; you won’t suffer any losses in the end. The design quality is high, and it also saves a lot of trouble in terms of construction and procurement, freeing up time and effort for you – something that money cannot replace ; If you don’t have much money and want to save, then there’s nothing more I can say! Simply put, it’s like buying things – you get what you pay for; you can’t get something worth 100 dollars by spending just 1 dollar! As for the matter of design quotes, you can refer to the book \"Design Man-hour Quota Standards\". You are Party A, and the books I’m referring to are those used as a reference by Party B when preparing quotes. However, it is rarely used in reality; it’s just for reference. I hope my answer can help you!
The design institute was of course chosen carefully; the management was willing to spend money on this. Mainly because the project isn’t very large, and larger design institutes are unwilling to get involved. The problem now is that the process package hasn’t been finalized, so the design institute needs to submit a quote first. We need to determine which design institute to use first; since we’ve never done this before, we don’t know how to select one.
Who is responsible for your process package, the design institute or the patent holder?
The process package is provided by the patent holder, while the design institute is responsible for the design.
This post was last edited by yuchenchf on 2015-9-28 at 16:11. I hope to get in touch with you. Please contact me through the in-site messaging.
It is recommended that the design firm invited should have similar project experience
Your bidding process can be carried out in two phases: in the first phase, a technical bid is submitted first, and once the technical aspects are determined, a construction bid is issued.