HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to assign personnel for the inspection and maintenance of pressure pipelines in chemical plants

2015-09-14View Original

Thread Content

How should the personnel for the inspection and maintenance of pressure pipelines be assigned? Our factory has steam pipelines, air compression pipelines, and nitrogen pipelines that lead to various workshops; how many staff members are needed?
Reply #22015-09-14
The allocation of personnel for the inspection and maintenance of pressure pipelines shall be carried out in accordance with the regulations on the management of special equipment.
Reply #32015-09-14
Our factory is specialized in this, and there is mainly just one person in charge.
Reply #42015-09-15
Are there any specific requirements? Is it determined based on the proportion of workers in the factory, or by the length of the pipelines, or according to the locations where they are used?
Reply #52015-09-15
Is one enough? Given the large scale of the factory, couldn’t we assign a dedicated person to be in charge for each usage site?
Reply #62015-09-16
Personnel are assigned based on a comprehensive consideration of the pipeline’s hazard level, quantity, and scope; our company is engaged in inspection and maintenance work for utility systems.
Reply #72018-03-16
It’s best to hire a management professional familiar with the chemical industry.
Reply #82018-03-19
Our company has one unit per workshop, and the equipment department provides another unit for common use; multiple inspection points are also beneficial
Reply #92018-03-19
What does this have to do with the number of people? The key question is how many locations need to be inspected.
Reply #102019-07-30
It’s not available anymore; it has been canceled. Thank you for your reply.
Reply #112019-07-30
First, you need to know the length of the pipelines to be inspected and the number of inspection points, in order to determine how many personnel should be assigned overall.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.