Specifications for the flare vent line of a 1 million-ton reforming unit

2016-09-22View Original

Thread Content

Specifications for the flare vent line of a 1 million-ton reforming unit – Is it necessary to lay a new flare line in this case? I’m not sure about the situation in other plants
Reply #22016-09-26
Just waiting for the teachers in charge of the restructuring to provide an answer
Reply #32016-11-28
Since the devices are different, the emission data reported will certainly vary as well. To determine whether it is necessary to reconfigure the flare, it is necessary to examine the emission data first
Reply #42016-11-29
I agree with the opinion above. As a supplementary point, it should be noted that in the case of emergency venting, it is necessary to separately assess the capacity of the low-pressure gas system to avoid exceeding its tolerance limits;

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.