HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Heat exchanger core extraction issue

2015-09-14View Original

Thread Content

Previously, when looking at equipment layout diagrams, the core-pulling area was not indicated. After saying it several times, all new projects, regardless of their type, were given a core-pulling area; however, this was done in a rather casual manner, and in some cases the core-pulling area extended all the way to the main road. Asked about the type of heat exchanger; I don’t know. Checked the equipment list, but no model number was indicated.
Reply #22015-09-14
People in the piping field lack a sense of responsibility and are not careful when creating drawings; anyone who works with such designers is doomed! ! !
Reply #32015-09-14
This area for removing the core from the heat exchanger is necessary; we used to call it the “maintenance space”.
Reply #42015-09-14
The problem is that they don’t realize the severity of the issue; during the discussion, someone even asked whether this falls within our scope of work The master hasn’t paid before. It’s really frustrating.
Reply #52015-09-14
That’s what we mean as well – it’s called a maintenance area, or a maintenance passage
Reply #62015-09-14
I currently have a typical case on hand: a heater with U-tubes, where the tube bundle is directly against the wall. The labeling in this situation is really awkward :L
Reply #72015-09-14
Will it need to be lifted out entirely at that time? This is called reflecting on one’s mistakes
Reply #82015-09-15
There’s no truth without pictures – why not share them so everyone can discuss them? ---------------- If it’s inconvenient to use photos, you can draw something simple; even a hand-drawn diagram will do as long as it conveys the idea clearly
Reply #92015-09-15
It’s like running into bad luck – you can’t complain about your troubles and have nowhere to turn
Reply #102015-09-15
A poor level of design is still tolerable, but if one refuses to learn humbly and make corrections, there’s no hope left.
Reply #112015-09-15
The specifications are clear: the core extraction space must be indicated. Due to different styles, some use a dotted line, while others use a double-dotted line; in either case, an × must be drawn inside the square. To be honest, I feel very sympathetic. Why was this technician assigned here...? But on the 3rd and 5th floors, this space is called a “maintenance area” or a “maintenance passage”. I don’t agree. I’ll call this “Core-Pulling Space”. Let me explain my understanding of “core extraction space”: the area occupied by the core being removed from the heat exchanger. It merely indicates the space where the core is extracted, one side of the rectangle. “\"Maintenance area\": The space occupied during maintenance, including cranes, core pullers, and other machinery. We also designed this BOX for foreign companies, but it indicates that the actual item is different from the core-pulling space. “\"Maintenance passage\": refers to the area occupied by a person during maintenance work. Be careful not to get blocked (Earth Shaker). . . ), the path must be passable. Moreover, any platform on the system that is designated as a maintenance passage is considered a “maintenance platform”. When setting conditions, its load should be greater than that of the \"operating platform\"“

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.