Hydraulic test sequence

2015-10-06View Original

Thread Content

What is the sequence of hydrostatic testing for the tube side and shell side in floating-head heat exchangers? Why is it different from the hydrostatic testing sequence for heat exchangers with fixed tube sheets? Additionally, how are weld joints tested?
Reply #22015-10-06
Floating-head heat exchanger – the tube side is processed first, at this point the large cover has not yet been installed. But once there is a leak, it is necessary to first perform pressure testing on the shell side using a fake hood in order to determine which tube bundle is faulty. Fixed tube sheet – first test the shell side to check whether each tube bank is leaking.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.