HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Requirements for installing drain pipes in liquefied gas transmission pipelines

2015-10-18View Original

Thread Content

As stated in the title, for maintenance purposes, a drain is to be added at the end of the liquefied gas transmission pipeline to facilitate drainage after water is injected into the pipeline. Are there any requirements regarding the installation of such a drain on liquefied gas pipelines?
Reply #22015-10-18
The pressure isn’t that high; it’s not that serious, so it’s not necessary to use double valves. Now, for discharge valves of hazardous media that are not used frequently, pipe caps are installed on half of them.
Reply #32015-10-19
Yes, on liquefied gas pipelines, where drain valves are not used frequently, it is necessary to install pipe caps to prevent leaks inside the valves, as this could increase the safety risks associated with liquefied gas leaks.
Reply #42015-10-19
It is recommended to use dual valves for controlling the dehydration valve in general containers.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.