HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Counterflow protection in the turbine flow diagram

2015-10-23View Original

Thread Content

What do RFP load request, RFP reset stgr.1, RFP SUGRE EVENT TRIP, RFP BYV forced to open, RFP load ASC:energie solenoid, RFP 1st surge event, and surge counter mean? Thank you to the kind person who helped me
Reply #22015-11-04
Searching for MAN, and I saw this post. I have been involved in MAN testing, but it was some time ago; I’m not sure what the abbreviations mean, so I’m not sure. For reference: RFP load request: RFP (? ) Load request RFP reset stgr.1: RFP reset response (stgr? ) 1 RFP SUGRE EVENT TRIP: RFP surge vent trip RFP BYV forced to open: RFP BYV (?) ) Force RFP to activate; load ASC:energie solenoid; RFP loading anti-surge control: ENERGY solenoid valve. RFP 1st surge event: 1st level of anti-surge protection; surge counter: count of surge events. Is it related to the booster pump?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.