Whether it is a heat exchanger or a storage tank, it needs to be heated to a semi-hot state. The semi-hot medium is soft water, which has a low inlet temperature and a high outlet temperature. What is the specific principle behind adding a drain at the top of the feed water and an exhaust valve at the return water side? Seeking discussion: there are also liquid drainage and venting ports on the heat exchanger.
Reply #22015-10-26
I don’t understand whether soft water is a hot medium or a cold medium
Reply #32015-10-26
A vent is typically installed at the highest point of the pipeline; for example, in water coolers, the circulating water flows in from below and out from above, and since the highest point of the pipeline is located on the outlet pipe, a vent is installed there. There are shut-off valves for both the supply water and return water. Generally, a drain is installed after the supply water shut-off valve and before the return water shut-off valve, so as to drain the liquid when maintaining the equipment.
Reply #42015-10-27
Blowing or flushing before operation requires venting, and draining is sometimes necessary when the system is shut down.
Reply #52015-10-27
A drain valve is installed above the water supply for the following main purposes: 1. To release air when the system is put into use and to remove waste water. A vent valve is provided on the return water line: 1. To check the steam condensate; 2. To discharge the condensate when there is no path for it to flow elsewhere; 3. To release air during the first time the system is used
Reply #62015-10-27
Vent gas at the high point, and drain liquid at the low point
Reply #72015-10-27
For medium-temperature water, there is a 25 mm pipe connected to a stop valve between the supply and return pipes, enabling their recirculation. The drain port and vent port are, I think, meant for maintenance purposes
Reply #82015-10-27
When exactly should the discharge be carried out? When is it necessary to vent or drain?
Reply #92015-10-27
Mm-hmm, I think that’s also a likely possibility. Do you mean that guides need to be added to both of them?
Reply #102015-10-27
Mm-hm, it’s written very comprehensively. Thank you!
Reply #112015-11-02
Remove sediment, air blockages, and drain the liquid when servicing the equipment

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.