Are there any time limits for lifting operations? ? It seems there are no requirements?

2015-11-04View Original

Thread Content

Are there any time limits for lifting operations? ? For example, level 1 lifting shall not exceed 24 hours, level 2 lifting shall not exceed 48 hours, and level 3 lifting shall not exceed 72 hours? ? Our unit has set its own deadline; after the discussion, we’ll go do something else!
Reply #22015-11-04
There are no requirements; the company can decide for itself.
Reply #32015-11-05
I haven’t seen any time limit specified for this; operations should be carried out in accordance with the time limits stated on the work order or work permit.
Reply #42015-11-05
How is the time limit mentioned by the poster defined? Is it a limit on continuous operation time?
Reply #52015-11-06
That is, for example, if the weight requires level 3 lifting, then the permit for level 3 lifting specifies that lifting is allowed only for 72 hours; any extension beyond that time requires obtaining a new permit
Reply #62015-11-06
Is the lifting classification specified by regulations, or determined by the company itself? I can’t say whether this is reasonable or not. But setting it at 72 hours, I think is not too short, but rather too long. Over a period of three days, the conditions for lifting operations are likely to change, such as rain or snow, strong winds, changes in geological conditions caused by rain or snow, changes in personnel, and so on. After working for a certain period of time and taking a night break, the conditions should be re-verified the next day and an operation permit signed. The continuous working time should not be too long.
Reply #72015-11-06
It was decided by us ourselves; there’s no standard guideline for this. The standards state that no certification is required for loads under 10 tons, but our organization requires certification for all cases. This rule has been in place since the past, and considering the level of automation in our organization as well as the skills of our staff, to be honest, **with so many regulations, it’s really impossible to meet them all..... But we are working to improve things step by step
Reply #82015-11-17
Thank you to everyone above; I used to set my own deadline for the work permit, determining it based on my own requirements

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.