HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

One question per day (1122)

2015-11-22View Original

Thread Content

This post was last edited by Wang Tianze on 2015-11-23 at 18:51. 38. Protective grounding refers to the practice of connecting the metal casing of electrical equipment to (B) in a three-phase four-wire power supply system where the power source’s neutral point is grounded. A. Grounding electrode B. Power neutral wire C. Power live wire D. Insulator 39. When installing a pressure gauge, the pressure measurement point should be selected at the section of the pipe where the medium to be measured (A) is present. A. Laminar flow B. Pipe bend C. Pipe branch D. Pipe dead corner Closed!
Reply #22015-11-22
38. Protective grounding refers to connecting the metal casing of electrical equipment to (B) in a three-phase four-wire power supply system where the power source’s neutral point is grounded. A. Grounding electrode B. Power neutral wire C. Power live wire D. Insulator 39. When installing a pressure gauge, the pressure measurement point should be selected at the section of the pipe where the medium to be measured (A) is present. A. Laminar flow B. Pipe bend C. Pipe branch D. Pipe dead corner
Reply #32015-11-22
38. Protective grounding refers to connecting the metal casing of electrical equipment to (A) in a three-phase four-wire power supply system where the power source’s neutral point is grounded. A. Grounding electrode B. Power neutral wire C. Power live wire D. Insulator 39. When installing a pressure gauge, the pressure measurement point should be selected at the section of the pipe where the medium to be measured (A) is present. A. Laminar flow B. Pipe bend C. Pipe branch D. Pipe dead corner
Reply #42015-11-22
38. Protective grounding refers to connecting the metal casing of electrical equipment to (B) in a three-phase four-wire power supply system where the power source’s neutral point is grounded. A. Grounding electrode B. Power neutral wire C. Power live wire D. Insulator 39. When installing a pressure gauge, the pressure measurement point should be selected at the section of the pipe where the medium to be measured (A) is present. A. Laminar flow B. Pipe bend C. Pipe branch D. Pipe dead corner
Reply #52015-11-22
38. Protective zero connection refers to connecting the metal casing of electrical equipment to (A) in a three-phase four-wire power supply system where the power source neutral point is grounded. A. Grounding electrode B. Power neutral wire C. Power live wire D. Insulator 39. When installing a pressure gauge, the pressure measurement point should be selected at the section of the pipe where the medium to be measured (A) is present. A. Laminar flow B. Pipe bend C. Pipe branch D. Pipe dead corner
Reply #62015-11-22
38. Protective grounding refers to connecting the metal casing of electrical equipment to (B) in a three-phase four-wire power supply system where the power source’s neutral point is grounded. A. Grounding electrode B. Power neutral wire C. Power live wire D. Insulator 39. When installing a pressure gauge, the pressure measurement point should be selected at the section of the pipe where the medium to be measured (A) is present. A. Laminar flow B. Pipe bend C. Pipe branch D. Pipe dead corner
Reply #72015-11-22
The correct answer to this question is: B, A
Reply #82015-11-22
38. Protective grounding refers to connecting the metal casing of electrical equipment to (B) in a three-phase four-wire power supply system where the power source’s neutral point is grounded. A. Grounding electrode B. Power neutral wire C. Power live wire D. Insulator 39. When installing a pressure gauge, the pressure measurement point should be selected at the section of the pipe where the medium to be measured (A) is present. A. Laminar flow B. Pipe bend C. Pipe branch D. Pipe dead corner
Reply #92015-11-22
38 B. Power supply neutral wire 39 A. Straight-flow
Reply #102015-11-22
38. Protective grounding refers to connecting the metal casing of electrical equipment to (B) in a three-phase four-wire power supply system where the power source’s neutral point is grounded. A. Grounding electrode B. Power neutral wire C. Power live wire D. Insulator 39. When installing a pressure gauge, the pressure measurement point should be selected at the section of the pipe where the medium to be measured (A) is present. A. Laminar flow B. Pipe bend C. Pipe branch D. Pipe dead corner

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.