HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Can a steam extractor for the Hangqi 6MW unit be used without a drain valve?

2015-11-26View Original

Thread Content

In our plant, with the 6MW units operated by Hangzhou Steam Power, the vacuum level dropped from -0.090 to -0.088 after just 2 hours of operation; subsequently, the main exhaust pump was quickly shut down, and the vacuum level returned to -0.090, while the level of water in the hot well increased slightly. I wonder why a secondary hydrophobic system doesn’t have a hydrophobizer installed? Please ask an expert for help! ! !
Reply #22015-11-27
Level 1 must be installed, while Level 2 can be left uninstalled
Reply #32015-11-27
We installed U-tubes at the first stage, but no traps at the second stage. So what is the reason? I beg for an explanation?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.