HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to discharge materials from MTBE plants in winter

2015-12-21View Original

Thread Content

The equipment is shut down in winter – how should the materials be removed? How can freezing and condensation be prevented? Does anyone have a detailed plan for removing the materials? Please share it!
Reply #22015-12-23
When returning liquefied gas, it is necessary to control the pressure drop in the downstream pipeline to prevent excessive pressure reduction, which could lead to the gas expanding and absorbing heat, thereby damaging the pipelines. It is necessary to ensure the flow of circulating water inside the heat exchanger; if it is not possible to completely remove the liquefied gas, steam can be used to warm the pipes accordingly to ensure complete removal of the material.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.