HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to restart a sewage treatment plant in winter?

2015-12-12View Original

Thread Content

The AO system has a daily processing capacity of 1,200 tons. Due to the intermittent nature of production in the workshop, the system has not been fed with water for almost three months. When the temperature was high, some nutrients were added every few days; but once the temperature dropped, aeration was stopped. Currently, the temperature in the aeration tank is around 5 degrees. Plans are now to resume water feeding. Although there is steam available, it’s still uncertain by how much the temperature can be increased each day, what the target temperature should be, and at what temperature it’s possible to start feeding water in small amounts. Does anyone with experience in this area know anything about it?
Reply #22016-02-24
If you have problems with the fan, feel free to contact me; I’m from a professional Rotary Vacuum Pump manufacturer

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.