HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Daily Question】2016 1.11 Multiple-choice question Before ensuring airtightness of the device, it is necessary to properly prepare the reaction system and the low-pressure system ( ).

2016-01-11View Original

Thread Content

This post was last edited by Catalyzing a Grain on 2016-1-18 08:44. [Daily Question] 2016/1/11 – Multiple-choice question: Before ensuring the airtightness of the device, it is necessary to carry out ( ) work on the reaction system and the low-pressure system. Answer: B A. Replacement B. Isolation C. Pressure testing D. Pressure relief
Reply #22016-01-11
B. Isolation~~~~~~~~~~~~~~~~~~~~
Reply #32016-01-11
Before making the device airtight, the (B) work on the reaction system and the low-pressure system must be completed.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.