In the gas boiler room, where the gas pipelines enter the room, there are vent ports and sampling ports; is it reasonable to also provide a purging port next to the burner inside the room?
Reply #22016-01-14
It makes sense; before starting up, the pipes need to be purged with nitrogen before fuel gas can be introduced
Reply #32016-01-14
However, in real life, many boiler rooms do not have such a purge port; either blind flanges are installed at the ends of the pipes, or it is very rare to see a separate pipe with a valve attached for purging purposes.
Reply #42016-01-14
Is it related to factors such as the size of the boiler room, the purging method, and the frequency of starting and stopping? Adding blind flanges at the pipe ends can serve as purging interfaces; generally, gas pipelines for gas boilers and incinerators in the petrochemical industry are equipped with purging pipes, and SEI’s design specifications explicitly require their use.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.