:The LOL reactor weighs around 250 tons. What tonnage of crawler crane is needed roughly, and what is the daily cost approximately? ?
Reply #22016-01-25
The height and even the diameter of the reactor directly affect the selection of the crane. The provided data is unclear, so it’s impossible to answer.
Reply #32016-01-25
Yes, the parameters are incomplete; at least the following need to be determined: working radius, lifting height, lifting method, site conditions, etc. Lifting is a rather complex task
Reply #42016-01-26
New facility being built; the reactor is 35m tall
Reply #52016-01-26
:Lol, have the construction team prepare a lifting plan. Our reactor weighs 220 tons; its height is roughly the same as yours. Use a 630-ton crawler crane along with a 300-ton truck crane to handle the tail end of the operation

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.