【Daily Question】1.31 Fill-in-the-blank: Water pressure testing is a method in which the testing pressure should be () times the highest operating pressure

2016-01-31View Original

Thread Content

This post was last edited by Catalyzing a Grain on 2016-2-4 at 20:36. Fill-in-the-blank question: When conducting a pressure test using water, the test pressure should be (1.5) times the maximum operating pressure. +2 wealth for participation; +5 wealth for correct answers; +8 wealth for in-depth discussions. Participate in the following events: “I’m the Most Crazy” – +20 wealth, and “Haichuan Thanksgiving Season” – +30 wealth. [Petroleum chemicals event] Registration for “I’m the Most Crazy” event: http://bbs.hcbbs.com/thread-1487895-1-1.html (Source: Haichuan Chemicals Forum). Year-end event – “Haichuan Thanksgiving Season”: Surprises and big prizes await everyone who participates. http://bbs.hcbbs.com/thread-1532394-1-1.html (Source: Haichuan Chemicals Forum)
Reply #22016-01-31
For hydrostatic testing with water, the testing pressure should be 1.5 times the maximum operating pressure
Reply #32016-01-31
For hydraulic pressure testing, the testing pressure should be 1.5 times the maximum operating pressure
Reply #42016-01-31
The operating pressure isn’t relevant; it’s the design pressure that matters. For thermal pipelines, the temperature coefficient also needs to be taken into account
Reply #52016-01-31
For hydraulic pressure testing, the testing pressure should be 1.5 times the maximum operating pressure
Reply #62016-01-31
1.5 The hydrostatic test of indoor water supply pipes must meet the design requirements. When not specified in the design, the test pressure for water supply pipe systems made of various materials is 1.5 times the operating pressure, but it must not be less than 0.6 MPa. Testing method: For metal and composite pipe water supply systems, the system is held at the test pressure for 10 minutes; the pressure drop should not exceed 0.02 MPa. After that, the pressure is reduced to the operating level for inspection, during which no leaks should occur ; The plastic pipe water supply system should be held at the test pressure for 1 hour, with a pressure drop of no more than 0.05 MPa; thereafter, it should be held at 1.15 times the operating pressure for 2 hours, again with a pressure drop of no more than 0.03 MPa. At the same time, it is necessary to check that there are no leaks at any connections.
Reply #72016-01-31
For hydraulic pressure testing, the testing pressure should be 1.5 times the maximum operating pressure

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.