Transformed waste boiler

2016-02-16View Original

Thread Content

Is it necessary to boil the furnace before starting up after a transformation of the waste boiler? If needed, how should it be cooked? Please ask an expert to help answer
Reply #22016-02-18
You can search on the forum; there’s a lot of relevant information available
Reply #32016-02-26
It is definitely necessary; the method is as follows: 1. Establish the liquid level. 2. When driving, the waste boiler uses steam supplied from the bottom to preheat the boiler water, gradually increasing the temperature. The heating (cooling) rate ≤ 40°C/h. 3. The continuous blowdown from the drum, as well as the periodic blowdown from the waste boiler and the bottom of the drum, should be carried out in accordance with the relevant regulations for boiler operation. 4. The steam valve for connecting to the waste boiler must be closed, and preheating should continue until the steam pressure in the waste boiler is equal to or close to the preheating steam pressure used.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.