This post was last edited by hesonchang214 on 2016-3-3 09:14. Reward for participation: 2 Wealth. Reward for correct answer: 9 wealth. The construction cost of a certain project, the cost of the equipment to be installed, and the installation cost are 10 million yuan, 12 million yuan, and 3 million yuan respectively, while the management fee for the project owner is 400,000 yuan. If the construction cost of a workshop, the cost of the equipment to be installed, and the installation cost are 6 million yuan, 6 million yuan, and 1 million yuan respectively, then the amount of the construction unit’s management fees that should be allocated to this workshop is ( ) million yuan.   A.32.0 B.20.8 C.24.0 D.20.0 Correct answer: B.20.8
Reply #22016-02-22
The answer says B, but it is incorrect. The management fee for the construction entity is allocated proportionally based on the total cost of the construction work, the installation work, and the cost of the equipment to be installed. It follows that (1000 + 1200 + 300) / 40 = (600 + 600 + 100) / Management fees allocated to each workshop; thus, the management fees allocated to each workshop amount to 20.8. The costs for the construction work of a certain project, the cost of equipment to be installed, and the cost of installation work are 10 million yuan, 12 million yuan, and 3 million yuan respectively, while the management fees incurred by the project owner amount to 400,000 yuan. The construction costs for a certain workshop, the cost of the equipment to be installed, and the installation costs amount to 6 million yuan each, 6 million yuan respectively _ Baidu ZYBANG http://www.zybang.com/question/49d4bfb014f468c7becb61eba991df4b.html
Reply #32016-02-22
The construction cost of a certain project, the cost of the equipment to be installed, and the installation cost are 10 million yuan, 12 million yuan, and 3 million yuan respectively, while the management fee for the project owner is 400,000 yuan. If the construction cost of a workshop, the cost of the equipment to be installed, and the installation cost are 6 million yuan, 6 million yuan, and 1 million yuan respectively, then the amount of the construction entity’s management fees that should be allocated to this workshop is (D) million yuan.   A.32.0 B.25.5 C.24.0 D.20.0
Reply #42016-02-22
This post was last edited by hesonchang214 on 2016-2-22 at 12:00. The answer given was B, but it is incorrect for this question. The management fee for the construction entity is allocated proportionally based on the total cost of the construction work, the installation work, and the cost of the equipment to be installed. It follows that (1000+1200+300)/40 = (600+600+100) / Management fees allocated to each workshop; thus, the management fees allocated to each workshop amount to 20.8
Reply #52016-02-22
The construction cost of a certain project, the cost of the equipment to be installed, and the installation cost are 10 million yuan, 12 million yuan, and 3 million yuan respectively, while the management fee for the project owner is 400,000 yuan. If the construction cost of a workshop, the cost of the equipment to be installed, and the installation cost are 6 million yuan, 6 million yuan, and 1 million yuan respectively, then the amount of the construction entity’s management fees that should be allocated to this workshop is (D) million yuan.   A.32.0 B.20.8 C.24.0 D.20.0
Reply #62016-02-22
The construction cost of a certain project, the cost of the equipment to be installed, and the installation cost are 10 million yuan, 12 million yuan, and 3 million yuan respectively, while the management fee for the project owner is 400,000 yuan. If the construction cost of a workshop, the cost of the equipment to be installed, and the installation cost are 6 million yuan, 6 million yuan, and 1 million yuan respectively, then the management fee that should be allocated to this workshop is (C) million yuan.   A.32.0 B.20.8 C.24.0 D.20.0
Reply #72016-02-22
B.20.8 ~~~~~~~~~~~~~~~~~~~~~

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.