I wonder why the SH/T3010-2013 \"Design Code for Insulation of Petrochemical Equipment and Piping\" does not contain any provisions regarding pipeline insulation...

2016-02-25View Original

Thread Content

The SH3010-2000 standard includes both construction and design aspects. I would like to ask the experts: where can I find the information on construction as outlined in the older standards? I’m looking for schematic diagrams related to pipe insulation structures; I’m not sure which standard contains them Thank you in advance.
Reply #22016-02-25
The 2000 version of the standard was titled \"Technical Specifications for Insulation of Petrochemical Equipment and Piping\", while the new one is called a design standard. What standard has become that separate part?
Reply #32016-02-25
The \"Regulations on the Management of Insulation and Cooling for Equipment and Pipelines\" revised by our factory in 2015 still require the use of SH3010 \"Technical Specifications for Insulation of Petrochemical Equipment and Pipelines\" as well as SH/T 3522 \"Construction Standards for Insulation Projects in the Petrochemical Industry\" for the implementation of insulation and cooling work, with acceptance being carried out in accordance with SH/T 3522.
Reply #42016-02-25
Does that mean the SH3010 \"Technical Specifications for Insulation of Petrochemical Equipment and Piping\" has not yet been repealed? Its usability is more comprehensive than that of the new standards, right?
Reply #52016-06-08
Dear experts, regarding chemical engineering projects, does SH3010 \"Technical Specifications for Insulation of Petrochemical Equipment and Piping\" guide the construction process or the inspection and acceptance? Furthermore, for construction projects, in addition to referring to the acceptance specifications and relevant technical standards for quality inspection, (the acceptance specifications are sometimes too lenient)?) How significant is the reference value of design specifications?
Reply #62016-06-08
@ylb913, which factory do you work for? I hope to have an in-depth discussion with you.
Reply #72016-06-11
President Yu is a senior expert at Haichuan. If you have any questions, feel free to ask – President Yu will help answer them

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.