HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

During the audit, it was found that the actual process parameters on site did not match those specified in the work instructions. How should follow-up audits be conducted?

2016-02-28View Original

Thread Content

This post was last edited by zjp on 2016-3-1 08:29. During the audit, it was found that the actual process parameters at the site did not match those specified in the operation instructions; how should tracking audits be carried out in such cases?
Reply #22016-02-28
Check the degree of impact of the parameters, the number of similar issues, the implementation of the changes, as well as the review and documentation of those changes

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.