HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is it necessary to connect a nitrogen line to the underground oil-containing wastewater tanks and the amine solution preparation and recovery tanks?

2016-03-03View Original

Thread Content

When is O(∩_∩)O generally used? Thanks
Reply #22016-03-03
If a gas seal is considered, connect it to the nitrogen line; if a solution is used for rinsing, connect it to the water line
Reply #32016-03-03
There is a line for desalinated water, but it’s closed with a blind flange; the blind flange valve is opened when amine solution is added to introduce water. There is also a line for low-pressure steam purging, which is similarly closed with a blind flange. For gas sealing, is it necessary to use a self-acting control valve to continuously supply nitrogen? The nitrogen pipeline installed now is also closed using a valve assembly and a blind flange
Reply #42016-03-03
With a gas seal, the self-acting control valve automatically supplies nitrogen

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.