Do the complete sets of pressure vessels installed on-site require the construction unit to obtain an installation quality certificate? 3543-G701

2016-03-12View Original

Thread Content

Do the complete sets of pressure vessels installed on-site require the construction unit to obtain an installation quality certificate? 3543-G701
Reply #22016-03-12
Notice for the installation of pressure vessels: if the installation is carried out by the manufacturing unit, the client party does not need to issue any documents. If the installation unit and the manufacturing unit are not the same, the owner should provide the pressure vessel’s accompanying documents to the installation unit, which will then handle the necessary notification procedures. Pressure vessels and pressure pipelines fall under the two categories of special equipment that require installation; the installation layout diagrams for pressure vessels and their auxiliary equipment (provided by the pressure vessel manufacturers) are supplied by those manufacturers, while the installation schematics for pressure pipelines require design drawings prepared by professional design firms. Both the installation of pressure vessels and pressure pipelines requires relevant qualifications, namely a pressure vessel installation license and a pressure pipeline installation license; these two licenses cannot be used interchangeably. For example, if the pressure vessel room is contracted out in separate sections, the owner needs to coordinate the following tasks. The pressure vessel manufacturer must provide the installation dimensions of the vessels, installation layout plans, foundation diagrams, details of auxiliary equipment, and information regarding the power consumption of such equipment. During the installation process, the installation contractor must first go through the necessary procedures to obtain approval from the inspection agency before starting work; construction then takes place under the supervision of this inspection agency (though this is often more of a formality). After completion, the installation contractor, the owner, and the inspection agency jointly conduct an inspection, with the inspection agency issuing a certificate confirming that the installation has been completed satisfactorily. The owner then uses this certificate to apply to the relevant authorities for a registration permit for using the pressure vessels. Pressure pipelines are more or less the same. If it is not clear what documents are required, you can go to the Special Equipment Department of the local technical supervision bureau for consultation.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.