HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Weekly Topic】【Engineering Version 20160315】

2016-03-15View Original

Thread Content

Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. Multiple-choice question: **The quality supervision agency shall conduct irregular inspections of the progress of construction projects in accordance with the supervision plan; inspections should be carried out on a monthly basis during the ( ) phase.** A. Foundation construction B. Construction preparation C. Equipment installation D. Completion acceptance E. Main structure construction 【Haichuan Thanksgiving】--Production area 【Production and Management Area】Seeking moderators and technical discussants to join
Reply #22016-03-15
**The quality supervision agency shall conduct irregular inspections of the project status in accordance with the supervision plan, with inspections to be arranged on a monthly basis during the (AE) phase. A. Foundation construction B. Construction preparation C. Equipment installation D. Completion acceptance E. Main structure construction
Reply #32016-03-15
A, Foundation construction E, Main structure construction

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.