HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How is the external coil (non-half-coil) installed on the tank?

2016-04-06View Original

Thread Content

The company now needs to add coiled tubes to a reaction tank. The calculations have been completed, and D27 pipes have been selected. However, I haven’t found any construction guidelines on how to proceed with this task. Could anyone among you please help me by telling me the construction method?
Reply #22016-04-06
Similar to pipeline heat tracing, the issue is how to fix it; whether the specifications for pipeline heat tracing can be referenced.
Reply #32016-04-07
The half-pipe for DN27 is a bit small. What size is your cylinder? In construction, the semi-tube is first shaped by bundling, then assembled onto the end caps and the cylinder body, followed by welding.
Reply #42016-04-07
On-site welding, with heat bending while welding

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.