HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Principles for estimating leakage rates in closed systems? 】Seeking help

2016-04-13View Original

Thread Content

This post was last edited by lzl07151301 on 2016-4-13 at 10:43 :) Are there any formulas or guidelines for estimating the total leakage of system flanges, joints, and other sealing types, or for making such estimates based on the amount of water in the system?
Reply #22016-04-13
HJ/T169-2004 \"Technical Guidelines for Environmental Risk Assessment of Construction Projects\" – take a look at this
Reply #32016-04-13
The original poster can check page P949 of Volume 1 of the \"Chemical Process Design Manual\"; it contains information on the estimation of leakage amounts

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.