HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Oxygen pipeline construction

2016-04-25View Original

Thread Content

Construction requirements for oxygen pipelines, analyzed from aspects such as welding, degreasing, and cyclic degreasing
Reply #22016-04-25
The backside bead height after welding should be smooth, without slag. . . Strict degreasing is required, with an oil content of less than 125 g/square meter. . .
Reply #32016-05-03
http://a.picphotos.baidu.com/album/s%3D1400%3Bq%3D90/sign=e8226d44563d26972ad30c5965cb898a/a71ea8d3fd1f4134dfc455f0221f95cad0c85e48.jpg
Reply #42016-05-03
GB50030-2013 Code for Design of Oxygen Stations

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.