HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Safety Technology Exchange Edition: Daily Question (2016.5.5)

2016-05-05View Original

Thread Content

Type: Fill-in-the-blank question. Question: [Safety Techniques for Hot Work] A hot work analysis should be conducted before starting the work, with the following requirements: 1. The monitoring points for the hot work analysis must be representative; when working inside large equipment, monitoring and analysis should be carried out at the upper, middle, and lower sections; When performing hot work on long material pipelines, sectional analysis should be carried out after thoroughly isolating the area ; 2. When performing welding or heating work outside the equipment, a combustion analysis must be carried out within a range of not less than ____ meters from the point where such work is being done ; 3. The interval between fire hazard analysis and the actual welding work should generally not exceed ____ minutes; if the site conditions do not permit, this interval can be increased slightly, but it should not exceed 60 minutes ; 4. If the interruption time of the task exceeds 60 minutes, re-analysis is required; a fire hazard analysis must be conducted before starting any heating work each day ; Monitoring should be carried out at all times during special hot work operations ; 5. When using portable combustible gas detectors or other similar devices for analysis, the detection equipment must be calibrated using standard gas samples and found to be accurate. Answer: 10 ; 30
Reply #22016-05-05
10 30~~~~~~~~~~~~~~
Reply #32016-05-05
2, 10------3, 30
Reply #42016-05-05
2. When performing welding or heating work outside the equipment, a fire hazard analysis must be conducted within a range of not less than _10__ meters from the point where such work is being carried out; 3. The interval between fire hazard analysis and the actual welding work should generally not exceed __30_min; if the site conditions do not permit, this interval can be increased slightly, but it should not exceed 60 min ;

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.