HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How should the shell length of a fixed-tube-sheet heat exchanger be determined?

2016-05-11View Original

Thread Content

Is the length of the shell of the heat exchanger determined by the user themselves, or is it determined based on something else, such as GB151?
Reply #22016-05-11
The length of the heat exchange tubes should be calculated based on the heat exchange area, and then the length of the cylinder can be determined.
Reply #32016-05-12
Based on the heat exchange area, the length of the heat exchange tubes is calculated, and then the length of the cylinder is determined.
Reply #42019-12-18
What is the relationship between the length of the heat exchange tubes and the length of the cylinder? For example, if the length of the heat exchange tubes is 1 m, 2 m, 3 m, or 6 m, what should be the length of the cylinder?
Reply #52019-12-18
Heat exchange tube length – length of tube ends extending outward – thickness of tube sheet – gap between the cylinder and the tube sheet welds = length of cylinder
Reply #62019-12-18
What values should be used for the extension length of the pipe end and the gap at the weld between the cylinder and the pipe sheet? Are there any regulations regarding this? Thank you
Reply #72019-12-18
Length of the tube end protruding outward: It is generally set at 2–3 millimeters, and this value depends on the welding method used between the heat exchange tubes and the tube sheet as well as the wall thickness of the heat exchange tubes. In the case of vertical heat exchangers, there may be no protrusion at all. Refer to clause 6.6 in GB/T151-2014; the gap in the weld between the cylinder and the fixed tube sheet is usually set at 2 millimeters. Please also consult Appendix I of GB/T151-2014.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.