HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Desulfurization tower level

2016-05-14View Original

Thread Content

The HPF is used for desulfurization, and the liquid level in the desulfurization tower is generally maintained at 5–5.5 meters. However, the liquid level in Tower No. 2 keeps dropping, falling from 5.5 meters to 2.5 meters. Why? After pumping water from the low-level tank to the desulfurization tower, the liquid level continued to drop. Where has all the water gone? How can it be adjusted to keep the liquid level roughly constant?
Reply #22016-05-14
1. Level controller adjustment 2. Desulfurization fluid flow adjustment 3. Compressed air flow adjustment 4. Throttle valve adjustment

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.