HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Topic】【Civil Engineering Version 20160517】

2016-05-17View Original

Thread Content

Participation reward: 2 Wealth. Reward for correct answer: 9 Wealth. Multiple-choice question: Where can the construction joint of a concrete column be located? (  ) A、Base top surface B、Beam bottom C、2-3 cm below the slab bottom D、Slab top surface
Reply #22016-05-17
A、Base top surface B、Beam bottom D、Slab top surface
Reply #32016-05-17
USA~~~~~~~~~~~
Reply #42016-05-17
The construction joint of concrete columns can be placed at (A, B, D) locations.
Reply #52016-05-17
This post was last edited by ldj2008 on 2016-5-17 11:15; the answer is A B

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.