HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues related to the seismic design of oil tanks per GB50341-2014

2016-05-24View Original

Thread Content

In Appendix D of GB50341-2014, regarding the seismic design of oil tanks, in clause D3.5, the calculation of the fundamental period of coupled vibration of the tank’s contents involves δ1/3; the document specifies that this value refers to the thickness at 1/3 of the height of the tank wall and bottom plate; Does GB50341-2003 refer to the effective thickness? What causes the change? Additionally, when calculating the anchorage coefficient J, it is necessary to determine the parameter μ; what value should be used if αmax is less than 0.45? That is, how should the value be determined when the region is at 6 degrees or 7 degrees? Please give me some advice.
Reply #22016-07-06
Regarding this 1/3 height, it appears three times in GB50341; in D.3.5, δ1/3 is defined as the calculated thickness at the point on the tank wall that is 1/3 of the way up from the bottom plate; In note D.3.5 (page 207), δ1/3 refers to the wall thickness of the tank at 1/3 of the liquid level height ; On page 210, there is a discrepancy between the statements regarding the wall thickness at the upper part of the δ1/3 1/3 tank. Personally, I think it should be the effective thickness, because when calculating seismic resistance, the wall thickness of the steel plate is already determined. If calculated according to clause D.4.2, the μ for 7 degrees and 0.1g is greater than 1, around 1.015. However, I believe that a value of 1 should be used for 6 and 7 degrees, meaning no correction is necessary. For reference only.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.