Thread Content
Is it easy to obtain approval for the project and complete the environmental impact assessment procedures for a water-coal slurry gasifier? I had thought of this technology, but someone said that it’s **no longer encouraged to use such technology these days; it’s almost impossible to get approval for projects or conduct environmental impact assessments, right?** **Are there restrictions in this regard? Thank you
Slurry coal gasification is certainly not a technology that is doomed to decline or be phased out. Therefore, there will be no issue with project approval or failing to obtain environmental impact assessments when using this technology.
“Key gasification technologies during the 13th Five-Year Plan period: High-pressure large-scale water-coal slurry gasification technology at 8.7 MPa (coal feeding rate of 3,000 tons per day per furnace); Large-scale dry powder coal gasification technology at 4.0 MPa (coal feeding rate of 3,000 tons per day per furnace); Water-cooled wall gasification technology using water-coal slurry (coal feeding rate of over 2,000 tons per day per furnace); Pressurized coal gasification using a single-nozzle cold wall system (coal feeding rate of over 2,000 tons per day per furnace)
Coal chemical industry is now essentially considered a high-cost, high-energy, and high-emission sector, with overcapacity existing, which makes it difficult to obtain approval for new projects. **That’s how it is: when policies are strict, everything is restricted and nothing is allowed; when the policies loosen, chaos ensues.