The process has been switched to water supply and drainage; how should I view it?

2016-06-24View Original

Thread Content

This post was last edited by feidegenggaolds on 2016-7-30 at 12:27. There are many people in the process engineering department but not enough work, while there is a shortage of staff in the water supply and drainage field; I have switched from process engineering to water supply and drainage. What do everyone think?
Reply #22016-06-24
Either one will do; the manufacturing process is the same in both cases – it can be used on water as well as on materials. The key is to achieve something meaningful with it.
Reply #32016-06-25
That makes sense; I have to start over from scratch again
Reply #42016-06-25
Go get a degree as a power engineer, and then your salary will be like pocket money – keep it up!
Reply #52016-06-25
This is a good thing. The only downside might be that it’s difficult to be a project manager, but it’s definitely a good thing for one’s career. The process piping structure is known as the most troublesome; it involves the most work in design institutes but yields the least rewards. When a design institute is overloaded with work, these three people are already stretched to the limit handling 1 large project and 2 small projects; handling 2 large projects and 2 small projects keeps them so busy that they don’t get home until 8 p.m. every day. Plumbing is definitely a great job; you can work on 10 projects, and the bonuses will add up over time. Moreover, all the water supply and drainage pipes are buried underground. Once the project is 60% complete and the pipes have been buried, anyone else will have to fix any problems that arise – so don’t get too happy about that (those who have done design work understand this~)
Reply #62016-06-25
This post was last edited by feidegenggaolds on 2016-7-13 at 18:57. Thank you for your analysis, sir
Reply #72016-06-25
Moreover, regarding the process and piping, you can do two things: 1. When the project is 20% complete, ask the process team about the water supply and drainage requirements, and then immediately determine the location for the outlets of the buried pipes. At 2.60%, when it becomes clear that the process and piping designs need to be changed, tell them: We have already started working on the buried pipes, so we can’t make any changes; you should go ahead and make the changes yourselves. Then you move on to the next project. Don’t ask me how I know; I work in process engineering and piping~
Reply #82016-06-25
You're talking about the details; in terms of the overall direction, the manufacturing process should be better than that of water
Reply #92016-06-25
Don’t care too much about face; the moment you dare to trample it underfoot is when you’ve truly become proficient.
Reply #102016-06-25
For example, when working as a design manager/project manager, there are surely many people involved in processes and piping.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.