HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Protection issues during boiler shutdown

2016-06-30View Original

Thread Content

How to protect the boiler during shutdown? Dry protection, wet protection? Does the boiler water need to be replaced regularly? Are there any standards or guidelines to follow? 75-ton medium-pressure boiler
Reply #22016-06-30
How long is the shutdown time? Is a generator set available? Are there any requirements regarding start and stop times?
Reply #32016-06-30
It stops for over half a year each year; power generation still occurs, and starting and stopping it is mainly for emergency purposes.
Reply #42016-06-30
It is best not to shut down the boiler (unless under special circumstances); the cost of shutting it down for a few days before restarting it is very high, and it will take a long time to get the boiler running again

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.