HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Daily Question, June 30, 2016 (EIA Discussion): 3 Wealth points for replies, plus 5 Wealth points for correct answers (short answer question)

2016-06-30View Original

Thread Content

This post was last edited by Zhang Xiaopeng on 2016-7-1 at 17:40. Starting today, I will analyze the actual exam questions from past years’ environmental impact assessment exams together with everyone; we won’t analyze those from 2016 for now (I’m not entirely sure myself: lol). I hope everyone will participate actively so that we can learn together! ! ! To make it easier for everyone to work on the questions, I will only list the key information related to the questions in the case studies. If you want to read the full content of the case studies, you can download past exam papers from the Internet. Content of Question 3 in 2013 regarding the cogeneration project: The local area suffers from a shortage of water resources, with groundwater being the main source of water supply for the city; large-scale groundwater depression zones have emerged in this region. To the northwest of the city, there is a reservoir with a capacity of 3.2×107 m3, whose main functions are flood control, supplying water to the city, and providing water for agriculture. The city’s existing secondary municipal wastewater treatment plant is located in the southern part of the urban area, with a treatment capacity of 1.0×105 tons per day. Once the wastewater has been treated to meet the required standards, it is reused in the industrial zone situated in the southwest of the city. It is planned to construct a cogeneration project in phases within the industrial zone in the southwest of the city. The first phase plans to construct a 350 MW cogeneration unit, accompanied by a coal-fired boiler with a capacity of 1160 t/h. The cooling of the turbine exhaust gas is planned to be carried out using a secondary circulation cooling method, with one naturally ventilated cooling tower. (The common methods for cooling turbine exhaust gas include direct water cooling, air cooling, and secondary circulation chilled water cooling.) The water used in production mainly includes water for chemical systems, water for circulating cooling systems, and water for desulfurization systems. The consumption of fresh water is 4.04×105 tons per year, 2.89×106 tons per year, and 2.90×105 tons per year respectively, and it is planned to draw water from reservoirs. Groundwater is used for domestic water supply. Title: Propose an optimization plan for water use in this project and explain the reasons. Answer: 1. The cooling method for the turbine exhaust steam is to be changed from secondary circulation cooling to air cooling. Reason: Northern cities suffer from water shortages, so the use of air cooling is encouraged, as it is a water-saving measure. 2. Production water should be replaced with reclaimed water from urban sewage treatment plants, with reservoirs in the northwest serving as a backup water source; groundwater extraction is prohibited. Reason: The amount of water available from urban sewage treatment plants is more than sufficient to meet the water needs for production in this project; 1.0×105*365 > 4.04×105 + 2.89×106 + 2.90×105. 3. Reused treated wastewater should be used as much as possible for production purposes. Reason: The wastewater generated by power plants is easy to treat, allowing for zero emissions. Answer explanation: The information provided in this question is lengthy and scattered. The key point here is the order of using water resources: reclaimed water > surface water > groundwater. According to the given information, the area suffers from a shortage of water resources, and groundwater is the main source of water supply for the city; moreover, large-scale groundwater depression zones have formed in this region. Therefore, it is prohibited to extract groundwater.
Reply #22016-06-30
This post was last edited by wangld on 2016-6-30 at 16:34. 1. The cooling method for the turbine exhaust steam is proposed to be changed from secondary circulation cooling to air cooling. Reason: Northern cities suffer from water shortages, so the use of air cooling is encouraged, as it is a water-saving measure. 2. Production water should be replaced with reclaimed water from urban sewage treatment plants, with reservoirs in the northwest serving as a backup water source; groundwater extraction is prohibited. Reason: The amount of water available from urban sewage treatment plants is more than sufficient to meet the water needs for production in this project; 1.0×105*365 > 4.04×105 + 2.89×106 + 2.90×105. Moreover, treated wastewater should be used as much as possible for production purposes. Reason: The wastewater generated by power plants is easy to treat, allowing for zero emissions.
Reply #32016-06-30
1. The exhaust cooling of the steam turbine is planned to be changed from secondary circulation cooling to air cooling. Reason: Northern cities suffer from water shortages, so the use of air cooling is encouraged, as it is a water-saving measure. 2. Production water should be replaced with reclaimed water from urban sewage treatment plants, with reservoirs in the northwest serving as a backup water source; groundwater extraction is prohibited. Reason: The amount of water available from urban sewage treatment plants is more than sufficient to meet the water needs for production in this project; 1.0×105*365 > 4.04×105 + 2.89×106 + 2.90×105. 3. Reused treated wastewater should be used as much as possible for production purposes. Reason: The wastewater generated by power plants is easy to treat, allowing for zero emissions. Answer explanation: The information provided in this question is lengthy and scattered. The key point here is the order of using water resources: reclaimed water > surface water > groundwater. According to the given information, the area suffers from a shortage of water resources, and groundwater is the main source of water supply for the city; moreover, large-scale groundwater depression zones have formed in this region. Therefore, it is prohibited to extract groundwater.
Reply #42016-06-30
1. The exhaust cooling of the steam turbine is planned to be changed from secondary circulation cooling to air cooling. Reason: Northern cities suffer from water shortages, so the use of air cooling is encouraged, as it is a water-saving measure. 2. Production water should be replaced with reclaimed water from urban sewage treatment plants, with reservoirs in the northwest serving as a backup water source; groundwater extraction is prohibited. Reason: The amount of water available from urban sewage treatment plants is more than sufficient to meet the water needs for production in this project; 1.0×105*365 > 4.04×105 + 2.89×106 + 2.90×105. 3. Reused treated wastewater should be used as much as possible for production purposes. Reason: The wastewater generated by power plants is easy to treat, allowing for zero emissions. Answer explanation: The information provided in this question is lengthy and scattered. The key point here is the order of using water resources: reclaimed water > surface water > groundwater. According to the given information, the area suffers from a shortage of water resources, and groundwater is the main source of water supply for the city; moreover, large-scale groundwater depression zones have formed in this region. Therefore, it is prohibited to extract groundwater. Uh, the answers are all out; they weren’t hidden well!
Reply #52016-07-01
1. The exhaust cooling of the steam turbine is planned to be changed from secondary circulation cooling to air cooling. Reason: Northern cities suffer from water shortages, so the use of air cooling is encouraged, as it is a water-saving measure. 2. Production water should be replaced with reclaimed water from urban sewage treatment plants, with reservoirs in the northwest serving as a backup water source; groundwater extraction is prohibited. Reason: The amount of water available from urban sewage treatment plants is more than sufficient to meet the water needs for production in this project; 1.0×105*365 > 4.04×105 + 2.89×106 + 2.90×105. 3. Reused treated wastewater should be used as much as possible for production purposes. Reason: The wastewater generated by power plants is easy to treat, allowing for zero emissions. Answer explanation: The information provided in this question is lengthy and scattered. The key point here is the order of using water resources: reclaimed water > surface water > groundwater. According to the given information, the area suffers from a shortage of water resources, and groundwater is the main source of water supply for the city; moreover, large-scale groundwater depression zones have formed in this region. Therefore, it is prohibited to extract groundwater.
Reply #62016-07-04
1. The exhaust cooling of the steam turbine is planned to be changed from secondary circulation cooling to air cooling. Reason: Northern cities suffer from water shortages, so the use of air cooling is encouraged, as it is a water-saving measure. 2. Production water should be replaced with reclaimed water from urban sewage treatment plants, with reservoirs in the northwest serving as a backup water source; groundwater extraction is prohibited. Reason: The amount of water available from urban sewage treatment plants is more than sufficient to meet the water needs for production in this project; 1.0×105*365 > 4.04×105 + 2.89×106 + 2.90×105. 3. Reused treated wastewater should be used as much as possible for production purposes. Reason: The wastewater generated by power plants is easy to treat, allowing for zero emissions.
Reply #72016-07-05
The project will use treated water from urban secondary sewage treatment plants for production purposes, with reservoirs in the northwest serving as a backup water source; groundwater extraction is prohibited (in water-scarce areas in the west). It is feasible to use the reclaimed water from urban secondary sewage treatment plants as process water, for the following reasons: (1) The water treated by urban secondary sewage treatment plants can be reused, and the discharge site is located in the industrial zone where this project is situated. According to the question, the treated wastewater from existing urban secondary sewage treatment plants is supplied for reuse in the industrial area located in the southwest of the city; this project is also situated in that southwestern industrial area, so it is feasible to lay pipeline networks there. (2) The water volume treated by the city’s secondary sewage treatment plant is sufficient to meet the production water needs of this project. The treatment capacity of the wastewater treatment plant is 365×105 tons per year (1.0×105 tons per day), while the amount of fresh water required for the production of this project is 35.84×105 tons per year, which represents only 9.8% of the plant’s treatment capacity. This amount is more than sufficient to meet the project’s water needs.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.