Participation reward: 2 Wealth. Reward for the correct answer: 9 Wealth. The \"Hot Water Network Specifications\" stipulate that a sectional valve should be installed at intervals of (  ) along the main transmission lines. A.1000m B.2000~3000m C.500m D.1000~1500m
Reply #22016-07-08
The Hot Water Network Code stipulates that a sectional valve should be installed at intervals of ( A ) along the main transmission lines. A.1000m B.2000~3000m C.500m D.1000~1500m
Reply #32016-07-08
The Heat Network Code stipulates that a sectional valve should be installed every ( B ) on the main transmission lines. A.1000m B.2000~3000m C.500m D.1000~1500m
Reply #42016-07-08
D. 1000~1500m

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.