HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is there any requirement for the fire distance from the fire dike to the building? ?

2016-07-19View Original

Thread Content

Is there any requirement for the fire distance from the fire dike to the building? ?
Reply #22016-07-19
Refer to GB50160, which specifies the exact distance requirements
Reply #32016-07-19
The distance between the fire dike and the building wasn’t covered; I hope someone expert can give some guidance!
Reply #42016-07-19
GB 50160 does not specify any requirements regarding the distance between fire dikes and buildings; there are no such distance requirements. However, there are fire separation requirements between buildings and certain types of equipment. For reference, one can consult the standard specification: GB50160 – Technology for Pressure Piping, Design of Pressure Piping and Related Engineering Practices
Reply #52016-07-20
There is a fire separation distance between the storage tank and the fire dike, as well as between the storage tank and the pump house and loading arms. There is also a fire separation distance between the storage tank and various buildings and structures. Reference.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.