Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. In the construction process of bored piles with mud wall protection, the tasks that are carried out after \"hole cleaning\" are ( ). A. Determine pile locations B. Install protection cylinders C. Prepare mud D. Lower the rebar cage [Production and Management Division] Seeking moderators and technical discussants to join [Task-based reward: 3000 wealth points] Original] Organize and organize the content of instrument-related posts [Task-based reward: 5000 wealth points] Original] Organize and summarize the content of control-related posts
Reply #22016-08-08
In the construction process flow of bored piles with mud wall protection, it is the task that is carried out after \"hole cleaning\" (D). A. Determine pile location B. Install casing C. Prepare mud D. Lower rebar cage
Reply #32016-08-08
A. Determine pile location B. Install casing C. Prepare mud

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.