Thread Content
Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. In accordance with the \"Code for Construction Project Supervision\" (GBT 50319-2013), the project supervision agency shall review the special construction plans submitted by the construction unit; if they meet the requirements, they shall be approved by the chief supervision engineer before being submitted to (). A. **Responsible department** B. Project owner C. Work safety supervision agency D. Engineering supervision unit 【Production and Management Division】Seeking moderators and technical discussants to join 【Task-based reward: 3000 wealth points】Original] Organizing and sorting out content in the instrumentation forum posts 【Task-based reward: 5000 wealth points】Original] Organizing and summarizing content in the control forum posts
In accordance with the \"Code for Construction Project Supervision\" (GBT 50319-2013), the project supervision agency shall review the special construction plans submitted by the construction unit; if they meet the requirements, they shall be approved by the chief supervision engineer before being submitted to (B). A. **Competent authority** B. Project owner C. Work safety supervision agency D. Project supervision unit
In accordance with the \"Code for Construction Project Supervision\" (GBT 50319-2013), the project supervision agency shall review the special construction plans submitted by the construction unit; if they meet the requirements, they shall be approved by the chief supervision engineer before being submitted to (). A.**Competent authority