HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Building design issues

2016-08-16View Original

Thread Content

In chemical manufacturing plants, the first floor is used as a warehouse while the second floor serves as workshops. Is it possible to avoid this arrangement? Are there any relevant laws and regulations regarding this?
Reply #22016-08-17
I heard it’s not allowed, but I couldn’t find any information on GB50016; it seems it should still be permissible. However, the requirements regarding safety evacuation exits in workshops might be stricter. It is recommended that you consult relevant experts. or from a design institute
Reply #32016-08-17
In chemical plants, the first floor is used as a warehouse, but what types of materials are stored there? The second floor is the workshop; what types of media are used there? It depends on the fire hazard associated with these materials

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.