HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

\"Great Capacity Regulations\"

2016-08-31View Original

Thread Content

Does the designer have the right to specify in the design documents the items and methods for regular inspection of fixed pressure vessels? What are the main items for regular inspection of metal fixed-pressure vessels? What other items should be added if necessary?
Reply #22016-09-01
The designer does not need to specify in the design documents the items and methods for regular inspection of fixed pressure vessels...
Reply #32016-09-01
It is generally not necessary, but of course, based on the characteristics of the equipment and the operating environment, certain requirements for regular inspections can be included in the risk assessment report.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.