HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What is the purpose of installing connecting pipes at the ends of the anode fluid inlet main pipe and the outlet main pipe of the electrolyzer?

2016-09-08View Original

Thread Content

What is the purpose of installing connecting pipes at the ends of the anode fluid inlet main pipe and the outlet main pipe of the electrolyzer?
Reply #22016-09-09
Venting during filling and rinsing; It can be kept open regularly; if there is gas in the saline feed pipeline, it can be discharged through the connecting pipe to prevent air blockages in the feed hose (especially after acid is added to the electrolytic cell, this connecting valve should remain open to ensure that the carbon dioxide generated by the reaction of carbonates after acid addition can be discharged promptly, thereby avoiding air blockages in the feed hose, lack of liquid flow from the discharge hose of the cell, low concentration of saline in the cell, and increased cell voltage)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.