HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Environmental Protection Daily Post 9.09: Reward for participation, plus 5 more rewards for answering 3 questions correctly

2016-09-09View Original

Thread Content

Multiple-choice question; The environmental impact report on electromagnetic radiation is prepared in two stages. In the first phase, the preparation of the \"Environmental Impact Report for the Feasibility Stage\" must be completed ( ). A. Before the location of the construction project is determined B. Simultaneously with the preliminary design of the construction project C. Before the construction project is approved for initiation D. Before the feasibility study report for the construction project is completed. C
Reply #22016-09-09
C. Before the approval of a construction project
Reply #32016-09-09
D. Before the completion of the feasibility study report for the construction project

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.