How should a temporary plan be designed for the heating furnace during the pre-heating preparation stage?
Reply #22016-09-22
This post was last edited by ylb913 on 2016-9-22 at 21:17. We still require the fuel system to be in working condition; we once considered using liquefied gas cylinders, but ultimately gave up on that idea. Additionally: When the hot work is not yet completed, the fire permit must be upgraded, and fire management should be carried out in accordance with the procedures for normal operating equipment. Stop all on-site construction work during furnace startup (there’s no way to take care of them).
Reply #32016-09-26
I think the original poster didn’t clarify the question – are they referring to temporary construction measures for the heating furnace? Or a security firewall solution?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.