HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Evaluation of equipment in production workshops

2016-10-03View Original

Thread Content

What are the internal assessment items for the production workshop on a monthly basis? It would be best to provide the table below for reference.
Reply #22016-10-03
Equipment operation rate, number of accidents indicator. Compliance rate of maintenance costs, quantity of recycled materials used, etc.
Reply #32016-10-03
Is there a form for assessment? Let’s exchange ideas
Reply #42016-10-03
Lubrication, integrity rate, leakage rate, unplanned maintenance, repair costs, recycling of waste materials, operational cycle
Reply #52016-10-03
The guy upstairs is right; additional items include equipment hygiene, site hygiene, equipment records, equipment training, and so on.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.