How is a pressure test conducted on a horizontal organic heat carrier boiler after it has been manufactured?

2016-10-15View Original

Thread Content

How are tests conducted after the manufacture of the horizontal organic heat carrier boiler body is completed? 1. Which standard should be referenced? GB/T17410-2008 is not clearly written. 2. If a boiler is subjected to a hydrostatic test and water cannot be drained completely after the test, what should be done?
Reply #22016-10-20
The standards specify technical requirements such as the test pressure and holding time, but they do not outline the procedures for testing boilers; these need to be defined in the factory’s process documents. In practice, however, no company formulates rules regarding how to drain water from the boiler – to do this, the boiler needs to be lifted and tilted to allow water to drain as much as possible, and high-power exhaust equipment can be used to assist with this process.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.