Thread Content
An environmental protection project that ensured all pipeline materials met petrochemical standards, with high-quality pipes being used. All steel pipes are seamless, all flanges are welded, and all connections use double-headed studs. The cost of the piping section is insanely high; I’m shocked.
If someone has money, what are you afraid of? The title must contain at least 4 characters.
Off-topic. Which side are you on?
Environmental protection projects, mainly involving water and gas; the pressure is not high, so a plain weld flange should suffice
I originally wanted to use the title \"Marking the Boat to Find the Sword\" to make it more subtle, haha.
Never mind, I won’t keep chatting nonsense with you in the tech section. Dual-phase stainless steel products are more expensive, right?
Haha, sometimes that’s the case with wealthy clients. I worked on a refined sugar project in Cambodia once, where the client insisted that all pipes and equipment in contact with the materials had to be made of stainless steel. As a result, even a CO2 pipe with a diameter of DN500 and a length of several hundred meters had to be made of stainless steel. The chief engineer in charge of reviewing the designs asked why such expensive materials were used; I replied that it was the client’s requirement – there was nothing we could do about it.
Encountered a property owner who has no shortage of money, but is just willful
The piping specialty used the petrochemical grade table; with a few modifications, the grade table was ready in half an hour.