HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to achieve argon shielding for TIG welding at the fixed joints of oxygen pipelines

2016-11-02View Original

Thread Content

Regarding high-oxygen gas pipelines, argon shielded welding is generally required. For pre-welded joints, argon protection can usually be ensured effectively. But for large-diameter fixed joints assembled at great heights, how do people ensure argon protection during the construction process?
Reply #22016-11-02
The inside of the pipe is filled with water-soluble paper, and then argon is pumped in;
Reply #32016-11-03
Try to leave the last seam near the flange. . .
Reply #42016-11-03
In addition to filling the back with argon gas, a protective coating is applied around the root groove.
Reply #52016-11-03
Is there any way to flush out argon?
Reply #62016-11-04
You are the last barrier left; you need to seal both ends, and then push argon gas in. That’s it. It’s just a little waste at most. . .
Reply #72016-11-04
The suggestions from above are great; they can be used as a reference. I’ve also learned* from them

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.